AI generator · free · no sign-up

Create requirements and functional specs with AI

Describe your initiative in a few sentences. PathHub writes a structured document with numbered, testable requirements, acceptance criteria and open points, as a Word file to keep editing.

Document type
Type of initiative
Free · no sign-up · Word export · your description is not used for training · Privacy

See it in action

A tour with real screenshots of the generator, using an ERP rollout as the example. The view advances on its own, click any step at any time.

app.pathhub.ai/spec
Input screen of the requirements specification generator: choose requirements spec or functional spec, type of initiative, description field and example buttons
Choose the document type and initiative, write a few sentences. Below the text field are ready-made examples that open instantly.
app.pathhub.ai/spec
Finished requirements specification for an ERP system with title, summary and buttons to download as Word, copy text and create a project plan
The finished document with table of contents. Download it as Word, copy the text or turn it into a project plan.
app.pathhub.ai/spec
Functional requirements F-01 to F-03 with priority MUST, description and acceptance criterion
Every requirement with ID, priority and acceptance criterion. These are the first functional requirements of the ERP example.
app.pathhub.ai/spec
Non-functional requirements for performance and availability with measurable targets and acceptance criteria
Non-functional requirements with targets. Values that were not in the description are marked as assumptions.
app.pathhub.ai/spec
Box with open points and assumptions to clarify before sending the document
What still needs clarifying is collected at the end, for example sites, user numbers, the accounting system and the budget frame.
Requirements specification result on a smartphone
Works on the go. Read the result on your phone, download it as Word or share the link.

Open an example right away, no waiting and no sign-up:

What the document contains

Not an empty template, but a written draft for your initiative.

Numbered requirements

Functional (F-01 …) and non-functional requirements (N-01 …), each stated on its own and unambiguously.

Priorities

MUST, SHOULD, COULD: so vendors know what is negotiable and what is not.

Acceptance criteria

A testable criterion for every requirement, used for sign-off.

Interfaces and migration

Which systems are connected and which data has to be migrated.

Data protection and works council

GDPR, data processing agreements and co-determination where the system can track performance or behaviour.

Open points

Assumptions are marked; everything still to be clarified is collected at the end.

What a result looks like

Excerpt from the ERP requirements specification example, exactly as the generator wrote it:

Requirements with acceptance criteria (excerpt)
IDRequirementPriorityAcceptance criterion
F-06Material requirements planning: The system shall calculate material requirements from production demand, bills of material, stock, reservations, open purchase orders, open production orders and replenishment lead times.MUSTFor a defined test scenario, the planning run creates the expected purchase and production proposals and identifies shortages with the required quantity and date.
F-10Accounting system interface: The ERP system shall exchange agreed master data and accounting-relevant transactions with the existing accounting system, including validation, error handling and duplicate prevention.MUSTAn agreed set of transactions is transferred, accepted by accounting, logged with a reference and rejected with an actionable error when mandatory data is missing.
N-01Performance: For the assumed initial load of 80 named users and up to 25 concurrent barcode users, standard searches, stock postings and order status transactions shall normally complete within three seconds.MUSTA documented performance test with representative master data achieves the three-second target for at least 95 percent of the defined standard transactions.

How it works

These are the steps the generator shows while writing. According to the app it takes about a minute.

  1. DescribeDocument type, initiative, a few sentences
  2. UnderstandingGoal, scope and systems
  3. Structuring requirementsFunctional and non-functional, numbered
  4. Writing chaptersWith acceptance criteria and open points
  5. Keep workingWord file or project planno sign-up

Tips for a good description

The more specific the input, the fewer assumptions in the document. Left: too short. Right: the input of the ERP example.

Too short

"We need a new ERP."

Good

"Introduce a new ERP system for a machinery manufacturer with 180 employees at two sites. Purchasing and production currently work with spreadsheets and a 15-year-old production system. Key areas: materials management, production planning, barcode warehouse management and an interface to the accounting system. Go-live by the end of Q3 next year."

Size, current systems, focus areas and deadline. That is enough for a document with 18 numbered requirements.
  • Who uses it? Departments, sites, rough number of users.
  • What exists today? Current systems, spreadsheets, paper processes.
  • What matters most? The three to five core functions and interfaces.
  • Which constraints? Deadline, budget frame, hosting, data protection, works council.
  • No confidential details: names, customer data or internal figures do not belong in the description.

Requirements or functional specification?

Requirements specification

Written by the client. Describes WHAT is needed and WHY: goals, requirements, constraints. The basis for proposals and vendor selection.

Functional specification

Written by the contractor. Describes HOW the requirements are implemented: architecture, solution per requirement, testing and acceptance.

Limits and data protection

1A draft, not a sign-off

Quantities, dates, budget and legal statements must be checked. Assumptions are marked in the text and collected at the end.

2It does not know your systems

Anything not in the description is added as an assumption. Internal rules and contracts are yours to add.

3No training on your data

Your description is sent to our AI provider to create the document and is not used for training. Details in the Trust Center.

4Deleted after 7 days

Documents created without an account are deleted after seven days. Download the Word file if you want to keep it.

Examples and templates

Frequently asked questions

Is the requirements specification generator free?
Yes. Without an account you can create up to three documents per day and download them as Word. With a free account you can keep working in PathHub afterwards.
What is the difference between a requirements and a functional specification?
The client writes the requirements specification: what is needed and why. The contractor writes the functional specification: how the requirements will be implemented. The generator creates both. You choose the document type first.
How good is an AI-generated requirements specification?
It is a structured, complete draft with testable requirements. Assumptions are marked and open points collected. Check and complete domain details, figures and legal points before use.
Can I edit the document?
Yes. You download it as a Word file (.docx) and edit it like any other document. Headings use built-in styles, so you can insert a table of contents.
What happens to my description?
It is sent to our AI provider to create the document and is not used for training. Documents created without an account are deleted after seven days. Details in the privacy policy.
What comes after the requirements specification?
With one click PathHub turns your initiative into a project plan with phases, tasks, schedule, budget, risks and stakeholders, also without sign-up.
How long does it take to create a requirements specification?
According to the app, the generator needs about a minute. The ready-made examples open instantly. Plan time afterwards to review the draft with the business and IT.
Which initiatives does the generator support?
ERP, CRM, software, website or portal and document management have their own settings; everything else uses "Other", for example a time tracking system, a machine or a service.
Can I get the result as a PDF?
The generator delivers a Word file (.docx). Save it as PDF in Word or LibreOffice with one click, for example to send it to vendors.

From requirements to project plan

PathHub also turns your initiative into a complete project plan: with schedule, budget, risks and compliance.

Create project plan →