Requirements and functional specification examples
Complete documents for typical IT initiatives (with numbered, testable requirements, as a Word file to keep editing). Created with the PathHub requirements specification generator.
Requirements specification examples
From the client's view: initial situation, goals, requirements and acceptance criteria.
ERP requirements specification
18 Requirements · ERP system
View exampleCRM requirements specification
20 Requirements · CRM
View exampleYour initiative isn't listed?
Describe it in a few sentences: the generator writes your requirements specification in about a minute. Free, no sign-up.
Create documentFunctional specification examples
From the contractor's view: architecture, implementation per requirement, testing, project phases and operations.
All examples at a glance
For ERP and CRM there is a matching pair: the client's requirements specification and the contractor's functional specification. All readable online and as Word files.
| Initiative | Requirements spec (client) | Functional spec (contractor) |
|---|---|---|
| ERP system | Requirements spec · 18 requirements Download Word | Functional spec · 19 items Download Word |
| CRM system | Requirements spec · 20 requirements Download Word | Functional spec · 20 items Download Word |
Count = numbered functional and non-functional items in each document.
Open an example in the generator
These examples open instantly in the generator, without waiting or signing up. From there you can download them as Word or turn them into a project plan.
How an example is structured
Using the ERP rollout: the functional specification as a Word file, followed by screenshots of the result in the generator.

Nine chapters plus open points. Anything the AI could not know is marked as an assumption so you can check it before sending.
- 12 implementation items (P-01 to P-12) with reference and acceptance test
- 7 quality requirements (Q-01 to Q-07)
- Migration concept with two rehearsals
- Nine-month schedule to go-live




Requirements vs. functional specification
The same requirement in both ERP examples shows how the functional specification answers the requirements:
F-04 Barcode warehouse operations: The system shall support barcode-based receiving, put-away, internal transfers, picking, material issue, stock counting and goods dispatch using handheld devices or fixed scanners.
P-07 Barcode warehouse processes: Implement barcode-supported goods receipt, put-away, warehouse transfer, production issue, finished-goods receipt, picking and stock count. Barcode formats and labels will be configured for the agreed materials and locations.
Acceptance: a warehouse user scans a test item and location for receipt, transfer and issue; the ERP records item, quantity, warehouse and location without manual re-entry.More in the functional specification template.
Frequently asked questions
Your own requirements specification in a minute
Describe your initiative: PathHub writes the document with numbered requirements and Word export. Free, no sign-up.
Create document →